PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Lifting the wire mesh before pouring concrete at the Main Lobby 102 Facing South (800x600).jpg Poured concrete slab on grade at the Monumental stairs Facing East (800x600).jpg Pouring concrete at the Main Lobby 102 (1) Facing South-East (800x600).jpg Pouring concrete at the Main Lobby 102 (2) Facing West (800x600).jpg Installed nelson studs at the 2nd floor Facing East (800x506).jpg Metal decking at Derrick -8 (Roof) Facing West (800x600).jpg Poured concrete slab on grade at the Main Lobby-Servery Room Facing East (800x600).jpg
Previous pageNext page Pouring concrete at the Main Lobby 102 (1) Facing South-East (800x600)
Pouring concrete at the Main Lobby 102 (1) Facing South-East (800x600)